施组英文典藏版--国外某机场项目异形连廊钢结构施工组织设计
本文档由 明天会更好 分享于2017-08-22 14:20
BRIEF SCOPE OF WORK:The scope of works relating to this method statement covers the installation of façade steel for the car park link bridges (CPLB).There are 2 CPLB, North & South, which link the main terminal building to the car park. Each CPLB is identical and is 130mtrs in length and varies in width from 11 to 18mtrs. The geometry of the bridge varies in..
33.0豆元
会员低至1折下载